News
08.07.2016

1. The bundling of filter by exhaust ducts is in progress.
2. The platform for the filter maintenance is installed and fixed.
3. The platform for maintenance of movement of mechanism for soot blower is installed and fixed.
4. The heat insulation of tank for the collection of processed dust is being done.
See section "Ecology" http://zzcm.com.ua/en/ekologia
02.07.2016

24.06.2016

Today, June 24, the installation of the main part of gas-cleaning unit has begun – it is a flat-hose filter with weight of 17 500 kg. With use of 63ton crane filter was installed on the bunker and fixed with installation bolts. Further, a camera of non-purified gas was installed onto the filter.
See section "Ecology" http://zzcm.com.ua/en/ekologia
23.06.2016

On June 21st, 2016 installation and commissioning of new gas treatment equipment, manufactured in Europe, has started at our factory
Today the filter bottom was installed on the base.
See section "Ecology" http://zzcm.com.ua/en/ekologia
26.01.2016
Dear partners!
We would like to inform you that the Zaporozhye Factory of Non-Ferrous Metals has received certificates from the German Testing and Sertification Institute VDE. These certificates are issued based on the results of testing of our cables and wires. The certificate confirms that our products do not contain hazardous materials, and it meets the European Directive RoHS.