News
Commissioning were started
26.08.2016
The heat insulation and installation of the filter are finished
The heat insulation and installation of the filter are finished. Also the works for connection of control cabinet of the filter are completed.
05.08.2016

See section "Ecology" http://zzcm.com.ua/en/ekologia
Commissioning works for the operation of exhauste
29.07.2016

The exhauster was connected to the exhaust duct.
Commissioning works for the operation of exhauster type DN 19 are in progress.
Adjustment of exhauster with frequency control drive for different modes of operation of exhauster are being done.
See section "Ecology" http://zzcm.com.ua/en/ekologia
Installation of new gas-cleaning equipment is being continued
The bundling of filter by exhaust ducts and filter heat insulation is in progress. Filter control cabinet connection is in progress.
22.07.2016

See section "Ecology" http://zzcm.com.ua/en/ekologia
Installation of new gas-cleaning equipment is being continued
18.07.2016

At present moment following works are done:
1. Exhauster was assembled and installed on the base.
2. Filter heat insulation is in progress.
3. Filter control cabinet connection is in progress.
See section "Ecology" http://zzcm.com.ua/en/ekologia